In Plant Houses
Client: Esso Nederland B.V.
Contract sum: € 1,950,000.00,-
Schedule: 2012
Scope of which generally consist of:
- Removing the existing site finishing, building site preparation
- Removing emergency stairs including Foundation of existing FCC building
- Excavating
- Performing on site soil remediation BE (95m3)
- Putting 22 + 37 drilling pipes
- Walls, columns and roofs are deposited in the work
- Supplying and installation of steel siding
- Supplying and installation of blast proof frames, Windows and doors
- Supplying and installation of floor and wall tiles
- Supplying and installation of siling system
- Supplying and installation of metal –stud walls
- Laying of rubber flooring and apply vinyl wallpaper
- Painting work
- Interior fittings
- E&I and HVAC installations
- Ground finish.