Nitrogen plant Gasunie
-
180 000 M3 nitrogen per hour
-
10 B Converting high- caloriffic gas to low- callorific gas
-
25 % Replacement of annual domestic gas consumption
In order to put this solution into practice on a large scale, it was decided in 2018 to build a nitrogen installation at Zuidbroek. This location was chosen because many gas transport pipelines converge here, making transport to and from Zuidbroek an obvious choice.
We build the heart of the installation – the factory where we extract the nitrogen from the air
One of the imported gas streams is natural gas which is available as LNG, liquefied natural gas, arrives at an LNG terminal in Eemshaven. Gas also comes via pipelines from, for example, Norway. This installation is located on the site of approximately 12 hectares. The installation will soon be able to extract 180,000 m3 of nitrogen per hour from the outside air and mix it with natural gas to the desired quality. This capacity is more than 10 times larger than the existing nitrogen installation in Zuidbroek.
The activities mainly consist on:
Multi-D works;
- Installation of Fundex piles
- Construction of heavy compressor foundations and concrete floors (approx. 15,000 m3 concrete)
- Construction of a compressor hall and transformer station of steel construction with prefab concrete
sandwich panels - Construction of sewage and fire water pipes
- Laying underground cooling water pipes (ø1100mm)
- Full site facilities
- Assembly of all structural steel, static and rotating equipment, pipes and pipe supports
- Module installation and implementation of tie-ins
- Pipes and Pipes Supporting Field and Shop Fabrication
- Non-destructive testing
- Welding heat treatment
- Painting and insulation works
- Assembly and testing of all electrical and instrumentation cabling, shunting cabinets, junction boxes,
- Instruments and equipment
- Installation of grounding circuit and lightning arrester system
- Heating
- Installation of cathodic protection
- Pre-commissioning activities