150 kV switching station

The activities mainly consisted on:

Civil:

  • Engineering (conversion of a traditional design to a prefab design);
  • Pile driving;
  • In-situ pouring of floors;
  • Supply and assembly of prefab elements;
  • Finishing (plumbing, low voltage installation, computer floors).