The civil works for the new SDA factory

SDA Project

The activities mainly consisted off:

The activities mainly consisted off:

Civil:

  • The activities consisted of: Pile driving (700 Vibro piles)-
  • Pile driving (285 Fundex piles)
  • Concrete slabs and foundations (cast on site)
  • Concrete columns and beams (cast on site)
  • Concrete columns and beams (precast)
  • Concrete wells and retention basins
  • Concrete pavement
  • Laying underground cables (cable pulling)
  • Sewage (HDPE and carbon steel)
  • Terrain finishing
  • Design & Construct of the Auxiliary Room (FAR building)
  • Architectural Services
  • Construction of a RoRo berth.


    Contractor = Fluorine / Jacobs