EO2 Production Plant Antwerp
The activities mainly consisted of:
The activities mainly consisted of:
Civil;
- Ground work for foundations;
- Pile trimming;
- Realization of various concrete foundations for equipment, buildings and piperacks (approx. 9.500m3 concrete);
- Realization of a waste water pit through immersion technique;
- Realization of a prefab concrete construction (table top) for floor + 8.40m;
- Realization of precast concrete floors in main steel construction (realized by third parties) at + 15.40m and + 22.00m;
- Realization of 4 precast concrete elevator shafts up to approx. 32.00m;
- The structural work of a concrete Switch- and Rackroom Building (24.0 x 28.0);