The realization of the concrete constructions for the new EO2 production plant.

EO2 Production Plant Antwerp

The activities mainly consisted of:

The activities mainly consisted of:

Civil; 

  • Ground work for foundations;
  • Pile trimming;
  • Realization of various concrete foundations for equipment, buildings and piperacks (approx. 9.500m3 concrete);
  • Realization of a waste water pit through immersion technique;
  • Realization of a prefab concrete construction (table top) for floor + 8.40m;
  • Realization of precast concrete floors in main steel construction (realized by third parties) at + 15.40m and + 22.00m;
  • Realization of 4 precast concrete elevator shafts up to approx. 32.00m;
  • The structural work of a concrete Switch- and Rackroom Building (24.0 x 28.0);