The complete realisation of a new hydrogen station

Everfuel Hydrogen station

The making of

Watch video
The activities mainly consisted on:

Civil

  • Earthworks;
  • 112 vibro piles;
  • Sewerage;
  • Pavement (Geosta and asphalt for roadway) stones on the concrete;
  • Concrete work (beams, floors and foundation blocks);
  • Prefab cable trays;
  • Fire-resistant walls;
  • Placing fencing;
  • Placing equipment;

E&I

  • Electricity distribution boxes (built by BNI);
  • Power lines;
  • Cable routing;
  • EX lighting;
  • Terrain lighting;
  • CCTV system;
  • PLC;
  • Safety stop system;
  • Earthing and lightning protection;
  • Access control;