Everfuel Hydrogen station
The making of
Watch videoThe activities mainly consisted on:
Civil
- Earthworks;
- 112 vibro piles;
- Sewerage;
- Pavement (Geosta and asphalt for roadway) stones on the concrete;
- Concrete work (beams, floors and foundation blocks);
- Prefab cable trays;
- Fire-resistant walls;
- Placing fencing;
- Placing equipment;
E&I
- Electricity distribution boxes (built by BNI);
- Power lines;
- Cable routing;
- EX lighting;
- Terrain lighting;
- CCTV system;
- PLC;
- Safety stop system;
- Earthing and lightning protection;
- Access control;