Civil works for the new Effluent treatment plant.

Effluent Treatment Plant

The activities mainly consisted on:

The activities mainly consisted on:

Civil:

  • 1,800 m2 sheet piling
  • Headhunting from 738 piles
  • 790 m1 underground GRE pipes
  • 430 m1 underground GRE fire extinguishing pipes
  • 145 m1 sewage
  • pulling 67 km of cable
  • 3,100 m2 vacuum testing
  • 9,500 m3 building concrete
  • 2,389 tons of reinforcing steel
  • 1,550 m2 tank insulation
  • 6.500 m2 coating
  • 3,370 m2 concrete pavement
  • 5,800 m2 asphalt roads
  • Renovation of existing substation incl. HVAC installations