Waste Water Treatment Project Rotterdam Maasvlakte
Counter party: Bilfinger Tebodin Netherlands B.V.
The activities mainly consisted on:
The following was needed to be built for the new biofactory of aerobic and anaerobic wastewater treatment of the current facility.
- A new incinerator plant including waste heat recovery and flue gas treatment for destruction of the
CWW-stream. The incinerator will use existing waste streams as fuel. - Interconnecting scope: all required equipment, storage tanks, piping, tie-ins, pipe racks, foundations, power supply, instrumentation and process control work to integrate the new bioplant and incinerator plant in the existing facility.
Multi-D works;
- Detail engineering of concrete and steel piperack;
- Earth works;
- Reinforced concrete works (+/- 7.500 m3, including elevated structures);
- Construction of reinforced concrete Moving Bed Bioreactor (MBBR) basin and slab, 9 m high;
- Grouting;
- Produce and install pre-casted and steel piperacks;
- Installation and testing of underground services i.e. piping and earthing systems;
- Realization reinforced concrete paving with gutter and grating;
- Detail design, engineering and construction of Satellite Instrument House and Substation;
- Construction of asphalt road;