TenneT Land station Borssele
The activities mainly consisted on:
Civil;
- Pile driving (772 Vibro piles);
- Concrete slabs and foundations (in situ);
- Concrete walls (precast);
- Grounding systems;
- Technical installation building;
- Finishing the site, stone roads and fencing;
E&I
- Electrical and HVAC installations;