Vopak FireWater Pumphouse Europoort
Up close
Watch videoThe activities mainly consisted on:
Multi-D works:
- The realization of the water intake system
- The delivery and installation of a pump room with E&I space and a space for the diesel storage tank
- The supply and installation of a jockey/ and service water system
- Realization of a diesel oil system
- The realization of the sprinkler system in the pump room
- Installing a flushing facility
- All necessary electrical installation, instrumentation and automation
- All work for the construction of a basin
- Engineering, supply and installation of piping
- Engineering, supply and installation of drinking water supply
- Realization of all concrete works for the pump basin and inlet channel, including recesses and overfills for equipment and housings
- Delivery and installation of all steel constructions for the pump building
- Conducting tests