The engineering, delivery and implementation of the new fire water pump installation to be built

Vopak FireWater Pumphouse Europoort

Up close

Watch video
The activities mainly consisted on:

Multi-D works:

  • The realization of the water intake system
  • The delivery and installation of a pump room with E&I space and a space for the diesel storage tank
  • The supply and installation of a jockey/ and service water system
  • Realization of a diesel oil system
  • The realization of the sprinkler system in the pump room
  • Installing a flushing facility
  • All necessary electrical installation, instrumentation and automation
  • All work for the construction of a basin
  • Engineering, supply and installation of piping
  • Engineering, supply and installation of drinking water supply
  • Realization of all concrete works for the pump basin and inlet channel, including recesses and overfills for equipment and housings
  • Delivery and installation of all steel constructions for the pump building
  • Conducting tests