The realization of prefabricated and cast in-situ reinforced concrete structures including other specific infrastructural works

Revamp Advanced Hydrocracker

The activities mainly consisted on:

The activities mainly consisted on:

Civil:

  • Piling (1771 LEKA piles)
  • Piling (251 DPA piles)
  • Concrete slabs and foundations (in situ)
  • Concrete columns and beams (in situ)
  • Concrete columns and beams (precast)
  • Concrete pits and sumps (160 pieces)
  • Concrete paving
  • Fireproofing
  • Sewer works (HDPE and carbon steel)
  • Site finishing
  • Asphalt and brickwork