Revamp Advanced Hydrocracker
The activities mainly consisted on:
The activities mainly consisted on:
Civil:
- Piling (1771 LEKA piles)
- Piling (251 DPA piles)
- Concrete slabs and foundations (in situ)
- Concrete columns and beams (in situ)
- Concrete columns and beams (precast)
- Concrete pits and sumps (160 pieces)
- Concrete paving
- Fireproofing
- Sewer works (HDPE and carbon steel)
- Site finishing
- Asphalt and brickwork