Heineken Extension warehouse CS&L
The activities mainly consisted on:
Civil:
- Piling (prefab concrete piles: length of 14m1);
- Concrete slabs and foundations;
- Concrete floors;
- Steel constructions;
- Architectural works;
E&I
- Electrical and HVAC installations;
- Site finishing and pavements.