All civil, architectural and E&I works for the new warehouse for Heineken Zoeterwoude.

Heineken Extension warehouse CS&L

The activities mainly consisted on:

Civil:

  • Piling (prefab concrete piles: length of 14m1);
  • Concrete slabs and foundations;
  • Concrete floors;
  • Steel constructions;
  • Architectural works;

E&I

  • Electrical and HVAC installations;
  • Site finishing and pavements.