Replacement of the RTO Installation, blower B-411 and CO2 piping project

The activities mainly consist on:

Multi-disciplinairy works - Civil + Mechanical/Piping + E&I

During 1st shutdown 

  • Prefabrication of concrete slabs
  • Installation of concrete foundations
  • Supply and installation of pipe racks and pipe supports

During 2nd shut down period

  • Removal of existing SS piping, 48 inch
  • Replacement of existing SS piping, 48 inch
  • Installation of prefab concrete elements
  • Replacement of 2 existing RTO/ Blower units
  • Prefabrication piping works, diameter 1800 mm
  • Installations of SS piping works (spools)

E&I

  • Installation instrumentation 
  • Earthing works
  • Installation cable trays
  • Installation lighting