This project is an important step in Alco Energy Rotterdam's ambition to operate completely climate-neutral by 2030.
Replacement of the RTO Installation, blower B-411 and CO2 piping project
The activities mainly consist on:
Multi-disciplinairy works - Civil + Mechanical/Piping + E&I
During 1st shutdown
- Prefabrication of concrete slabs
- Installation of concrete foundations
- Supply and installation of pipe racks and pipe supports
During 2nd shut down period
- Removal of existing SS piping, 48 inch
- Replacement of existing SS piping, 48 inch
- Installation of prefab concrete elements
- Replacement of 2 existing RTO/ Blower units
- Prefabrication piping works, diameter 1800 mm
- Installations of SS piping works (spools)
E&I
- Installation instrumentation
- Earthing works
- Installation cable trays
- Installation lighting